![]() ![]() 9613 Performance Based Navigation Manual. The content of this AC is based on the guidance contained in the International Civil Aviation Organization (ICAO) Doc. This AC on its own does not change, create, amend or permit deviations from regulatory requirements, nor does it establish minimum standards. ![]() It describes an example of an acceptable means, but not the only means, of demonstrating compliance with regulations and standards. This Advisory Circular (AC) is provided for information and guidance purposes.LNAV/VNAVģ.4 Vertical Navigation Functions – Path Definitionģ.7 Capability to Load Procedures from the Navigation Databaseģ.9 User Interface - Displays and ControlĤ.3 Effect of Temperature on the Vertical Profileĥ.0 Flight Crew Member Knowledge and Training Required Navigation Performance Approach (RNP APCH) Issuing Office:ģ.3 Ops Spec 100 – Instrument Flight Rules Instrument Approaches Global Positioning SystemĤ.2 Lateral Navigation/Vertical Navigation MinimaĤ.3 Localizer Performance with Vertical Guidance MinimaĤ.4 Localizer Performance without Vertical Guidance MinimaĤ.5 Required Navigation for RNP Approach Minima Typesĥ.1 Advisory and Approved Vertical GuidanceĨ.2 Global Positioning System Notice to AirmenĨ.3 Wide Area Augmentation System Notice to AirmenĪPPENDIX A - Criteria Specific to: Ops Spec 620 Required Navigation Performance Approach (RNP APCH) – restricted to LNAV Minima only and Ops Spec 620 Required Navigation Performance Approach (RNP APCH) – restricted to lnav and lnav/vnav minima onlyġ.1 On Board Performance Monitoring and Alertingġ.3 Criteria for specific navigation systemsġ.4 Functional Requirements - Navigation Displaysġ.5 Functional Requirements - CapabilitiesĢ.2 Aircraft-based Augmentation System (ABAS) (RAIM) availabilityĢ.3 SBAS and other Augmented GNSS availabilityģ.0 Flight Crew Member Knowledge and TrainingĪppendix B – Criteria Specific to Ops Spec 620 Required Navigation Performance Approach (RNP APCH) (unrestricted)ġ.1 On-Board Performance monitoring and alertingĢ.1 Approach Operations Utilizing Baro-VNAV equipmentĢ.2 Procedure Design – LNAV vs.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |